We have performed Ariba OS and DB upgrade. Ariba OS upgraded from Window 2003 to Window 2008 R2 and DB v9.1 upgraded to DB v9.7.
We have experienced performances issues now after the Ariba OS and DB2 upgrade. User unable to perform the daily activities like raise PR, approve PR or search PR/PO/RC. The system will keep loading in progress and hang. Additionally, it takes about 5-10 mins to search or load PR/PO/RC.
We has been restart the nodes and check all the possibilities of the root caused of the performances issues. We are working on several action and figure out on how to make the system run faster.
Appreciate anyone can help on this issues . Thanks.