Quantcast
Channel: Ariba Exchange: Message List
Viewing all articles
Browse latest Browse all 3363

SAP Material Number MATNR mapping in Ariba P2P

$
0
0

Hi Experts,

 

Is it required or even possible to replicate SAP material master field MATNR i.e. material number to Ariba? Or does the mapping happens only between Material group and commodity code?

If there is no mapping defined at material number level then how do validations work while creating a requisition in Ariba with SAP as backend?

For e.g. the error "material does not exists in plant xxx or has been marked for deletion", for this kind of validation there has to be a mapping at item number level. How does it works?

 

 

 

Thanks,

Anubhav


Viewing all articles
Browse latest Browse all 3363

Trending Articles