Hi Experts,
Is it required or even possible to replicate SAP material master field MATNR i.e. material number to Ariba? Or does the mapping happens only between Material group and commodity code?
If there is no mapping defined at material number level then how do validations work while creating a requisition in Ariba with SAP as backend?
For e.g. the error "material does not exists in plant xxx or has been marked for deletion", for this kind of validation there has to be a mapping at item number level. How does it works?
Thanks,
Anubhav